Please download the EOI Form from the link below. Interested parties can fill and submit the form to info@cimex.com.np before 23rd Asoj, 2077 (i.e. 9th October, 2020).

For further more information call +977-9841565201

परिप्रेक्ष्य अपरेटरहरुलाई प्रस्तुत निर्धारित ढाँचामा जानकारी भरी – २३ असोज भित्र info@cimex.com.np मा पठाउन अनुरोध गरिएको छ।

अधिक जानकारी को लागी कल गर्नुहोस् +977-9841565201

EOI Form Link

About GCC Model

Under the proposed GCC (Gross Contract Cost) model, Cimex Inc. will provide the bus and after sales and servicing service to operator on per km rate basis. The per km rate will be defined through consent of both parties. The operator shall be liable to pay to Cimex per month lease fees based on the kilometer driven by the operator during the period. The operator will have full responsibility to collect revenues, hire manpower and perform any other function related to the operation of electric bus. At the end of the GCC term the ownership of the bus will be transferred to the operator.

Disclaimer: The full details for the GCC shall be provided to select operators. The above present condensed information may not fully reflect the liabilities and responsibilities of all parties.